Generous 15-day free storage dwell time for all laden and empty transshipment containers moving to/from feeder and mainline vessels.
Full 7-day free dwell window for loaded import and export road containers before demurrage storage tiers apply.
Low-cost reefer plugging, electricity supply, and automated temperature monitoring per 4-hour shift ($8 for 20ft / $12 for 40ft).
Direct Port Delivery (DPD) & Direct Port Entry (DPE) enabling factory-stuffing clearance with minimal dwell time and zero CFS middle-costs.
Interactive Terminal Tariff & Cost Estimator
Select container parameters, movement type, dwell days, and services to estimate terminal handling & storage costs instantly.
Official Tariff Booklet Directory
Browse official rates for Stevedoring, Storage Tiers, Reefer services, SSR activities, and Break-Bulk cargo.
🚢 3.1 & 3.2 Stevedoring Rates for Road & Transhipment Containers
USD CurrencyStevedoring rates cover handling by quay crane (discharge & loading), transportation between quay and yard, grounding lifts in CY, and landing or loading onto customer vehicle.
| Category & Operation | 20' (1 TEU) | 40' (2 TEU) | Over 40' (45ft) | Operational Inclusions |
|---|---|---|---|---|
|
Road / Local EXIM - Loaded Lift On / Off by Quay Crane |
$90.00 | $135.00 | $180.00 | Quay crane lift + lashing/un-lashing + transport to CY + 2 lifts in CY + landing/loading on truck |
|
Road / Local EXIM - Empty Empty container repositioning |
$60.00 | $90.00 | $120.00 | Quay crane lift + lashing/un-lashing + transport to CY + 2 lifts in CY + landing/loading on truck |
|
Transshipment - Loaded Sea-to-sea transshipment |
$110.00 | $165.00 | $220.00 | Full cycle: Discharge from mother vessel, yard transfer, two CY lifts, and reloading onto feeder vessel |
|
Transshipment - Empty Empty transshipment buffer |
$110.00 | $165.00 | $220.00 | Full cycle handling by quay crane (discharge and loading), transport, and grounding lifts |
⚠️ Hazardous Cargo (IMO Class)
Handling charges as above plus a premium of 50%. Empty tank containers must provide a clean certificate, otherwise treated as loaded hazardous cargo.
📏 Over Dimensional Containers (ODC)
Containers requiring slings/shackles/spreaders or carrying cargo beyond ISO dimensions: 100% premium on stevedoring. Storage charged at 4x normal.
⚖️ Heavy Gross Weight Surcharge (40T - 45T)
Weight surcharge of 100% applies on total THC for containers with gross weight between 40 Tonnes and 45 Tonnes (Surcharge = THC * 100%).
General Tariff Rules & Billing Policy (AVPPL Booklet Clause 4.0)
• GST & Statutory Levies: Goods and Service Tax (GST) and other statutory government levies are applicable at prevailing rates at the time of invoicing.
• Vessel Call Changes (VCN): VCN changes or shutouts charged at $50 (20') / $75 (40') / $100 (>40').
• Hazardous Spill Liability: Any spill cleanup and certified hazardous waste disposal to a government-approved facility shall be fully borne by the customer (container operator).
• Insurance: Adequate cargo insurance covering all maritime and shore risks must be maintained by the customer.